close
Request Services

Services

Construction of Hydraulic Works

Executing hydraulic works for IDC has become a great satisfaction since through these we contribute to developing communities and raising the standard of living of those who benefit. These types of works leave professional marks on us and that is to feel the gratitude and see the happy face of thousands of people is a sense of duty fulfilled.

Featured Projects

1200 MM Pumping Line La Zurza Interceptors

Santo Domingo

Construction of the 1200 MM Pumping Line for Interceptors of the Mirador Norte Subsystem (La Zurza) ”.

Microtunelation implementation in wastewater collectors for the La Zurza treatment plant, a pioneer application in the Dominican Republic, whose main objective is the collection of wastewater from the neighborhoods of the city of Santo Domingo.

Storage dam on the Yacahueque River

San Juan de la Maguana

The construction of the Yacahueque River Storage Dam is aimed at regulating river flows, so that they can be used to guarantee the supply of water in the dry season to agricultural crops in the valley of the Carrera de Yeguas municipality. , located downstream of this dam, as well as expanding the current irrigation area with the future use of new technology, up to around 40,000 tasks.

The Construction Project of the Yacahueque River Storage Dam consists of the construction of a land dam 34.50 meters high and 275 meters long.

Storage dam on the Yacahueque River

San Juan de la Maguana

The construction of the Yacahueque River Storage Dam is aimed at regulating river flows, so that they can be used to guarantee the supply of water in the dry season to agricultural crops in the valley of the Carrera de Yeguas municipality. , located downstream of this dam, as well as expanding the current irrigation area with the future use of new technology, up to around 40,000 tasks.

The Construction Project of the Yacahueque River Storage Dam consists of the construction of a land dam 34.50 meters high and 275 meters long.

Guayubín Dam

Santiago Rodríguez

The Project consists of the construction of a conventional concrete dam on the Guayubín River, in the Province of Santiago Rodríguez, to the northeast of the Paraje de Pastor and to the southwest of the Paraje de San José.

The Project is located in the Santiago Rodríguez Province, 10 km. Sabaneta and consists of a main concrete dam with an approximate height of about 39.65 m above the Guayubín River with a spillway designed for a flow of 1,280.00 m³/s and a lateral closure dam made of rockfill and clay core with variable heights, in the left bank.

The purpose of the Project is to increase the guarantee of water supply to the areas currently under irrigation, supply water to areas that, even with the required infrastructure, are not cultivated due to lack of water, incorporate new areas, supply drinking water and , in the future, to install a hydroelectric power plant with a capacity of 2,000 KW.

Expansion Miches Aqueduct

El Seibo

In order to improve the quality of life of the residents of the municipality of Miches, El Seibo province, and to promote tourism development in the area, the expansion of the Miches aqueduct is being built, concluding an existing 100 LPS water treatment plant and building a new 200 LPS plant to meet the demand of the hotel zones and sectors of the municipality through a distribution network and a drive line that will guarantee a constant supply of drinking water.

Expansion Miches Aqueduct

El Seibo

In order to improve the quality of life of the residents of the municipality of Miches, El Seibo province, and to promote tourism development in the area, the expansion of the Miches aqueduct is being built, concluding an existing 100 LPS water treatment plant and building a new 200 LPS plant to meet the demand of the hotel zones and sectors of the municipality through a distribution network and a drive line that will guarantee a constant supply of drinking water.

últimas obras

Pioneros en la
Industria de Construcción